|
|
|
부품번호 | CS-800 기능 |
|
|
기능 | OPERATION MANUAL | ||
제조업체 | ELTRA | ||
로고 | |||
전체 60 페이지수
OPERATION MANUAL CS-800
as from serial no. 1557040811
1 INSTALLATION
1.1 Setting up
1.2 Front panel illustration
1.3 Mains power connection
1.4 Data interfaces
1.5 Gas connections
1.6 Connecting the gas purification furnace
1.7 Auto loader
2 ANALYSIS
2.1 Working procedure
2.2 Work breaks
2.3 Preheating the crucibles
2.4 Applications
3 MAINTENANCE
3.1 General information
3.2 Installing and removing the reagent tubes
3.3 Filling the reagent tubes
3.4 Replacing the O-rings
3.5 Replacing the furnace cleaning brush
3.6 Cleaning the dust trap
3.7 Replacing the combustion tube
3.8 Replacing the generator tube
3.9 Changing the combustion coil
3.10 Removing the pedestal
3.11 Checking for gas leaks
4 DESCRIPTION OF FUNCTIONS
4.1 Measuring principle
4.2 Gas flow system
4.3 Infrared cell
4.4 Furnace
5 MISCELLANEOUS
5.1 Ordering numbers
5.2 Packing
5.3 CS-800 pre-installation guide
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
0
Free Datasheet http://www.datasheet4u.com/
1.3 Mains power connection
Since the infrared cell requires about 1 hour to reach a stable operating temperature, it is
advisable to connect the analyser to the mains power first and then switch on before further
installation work is carried out.
This waiting time is only necessary when installing the analyser. Since it is normally not
switched off, it will always be in operating temperature.
1
5
M odel : C S800 m ade in Ge rm any
Se ri al N o.: XX XXX XXX XX
V olt sA C: 230+/ - 10% Hz: 5 0-6 0
Am ps: 15
W at ts: 3500
I P20
1999
ELT RA G mbH
M a in st r. 85 B lo ck 2 0
D -4 14 6 9 N eu s
G er m an y
P h on e : + (4 9) 2 13 7 1 28 2 2 F a x: + ( 49 ) 21 3 7 12 5 13
C omp re sse d A ir
4 -6 b a r ( 60 - 90 p s i )
2 30 VAC +/ -1 0% 5 0/ 6 0Hz
ma x 1 5 A
Fu se slow blo w
16A
16A
6
230V AC 500W max
f or balance, pr inter
and comput er only
O xyg e n I np u t
2 -4 b a r ( 3 0- 6 0p s i )
9 9 , 9 % pu re
G a s ou tl et
7
2
3
4
2-2
1 Analyser
2 Computer
3 Monitor
4 Printer
5 Balance
6 Triple plug
7 Analyser mains plug
First connect the analyser to the mains power and switch it on. The switch, located on the
fore side of the analyser, is to be set to position 1.
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
1.3-1
Free Datasheet http://www.datasheet4u.com/
4페이지 1.6 Connecting the gas purification furnace
1
Mo d e l: C S8 0 0 made in Germany
S er ia l No . : X XXXX XXX XX
Vo lts AC : 23 0 +/- 1 0% H z: 5 0 -6 0
A mps : 1 5
W a tt s: 3 5 00
I P2 0 1 9 9 9
E LTR A Gmb H
Ma in st r. 85 Bl oc k 2 0
D-41 46 9 Ne u ss G erma n y
Pho ne : + (49 ) 21 37 12 8 22 F a x : + (4 9) 21 3 7 1 25 13
230V AC 500W max
f or b a la n c e, p r i nt e r
a n d co m p ut e r o n ly
Co mp r es se d A ir
4- 6 b ar ( 60 - 90 psi )
230V A C +/-10% 50/60Hz
m ax 15 A
Fu se sl ow b l ow
16A
16A
Ox y ge n I npu t
2 - 4 ba r ( 3 0- 6 0p si)
9 9, 9% pu r e
G as ou t let
220V ~
B 6-2-5
The tube from the pressure regulator is connected to the lower fitting of the gas purification
furnace, and the tube (1) is connected on its place. See the diagram above.
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
1.6-1
Free Datasheet http://www.datasheet4u.com/
7페이지 | |||
구 성 | 총 60 페이지수 | ||
다운로드 | [ CS-800.PDF 데이터시트 ] |
당사 플랫폼은 키워드, 제품 이름 또는 부품 번호를 사용하여 검색할 수 있는 |
구매 문의 | 일반 IC 문의 : 샘플 및 소량 구매 ----------------------------------------------------------------------- IGBT, TR 모듈, SCR 및 다이오드 모듈을 포함한 광범위한 전력 반도체를 판매합니다. 전력 반도체 전문업체 상호 : 아이지 인터내셔날 사이트 방문 : [ 홈페이지 ] [ 블로그 1 ] [ 블로그 2 ] |
부품번호 | 상세설명 및 기능 | 제조사 |
CS-800 | Full Duplex Interconnect | CONNECT SYSTEMS |
CS-800 | OPERATION MANUAL | ELTRA |
DataSheet.kr | 2020 | 연락처 | 링크모음 | 검색 | 사이트맵 |